Search
Close this search box.

Main component

Detailed maintenance parts

unnamed-(11)

1. Fuel booster

32,000 R/H

02

2. exh.valve actuator

32,000 R/H

03

3. Accumulator

32,000 R/H

03-4

4. FIVA valve

32,000 R/H

04

5. Cylinderr lubricator

32,000 R/H

05

6. Distributor block

32,000 R/H

Main component

Detailed maintenance parts

01

1. Accumulator block

32,000 R/H

02

2. Hydraulic hose

32,000 R/H

03

3. Accumulator

32,000 R/H

03

4. Compensator

32,000 R/H

GEISLINGER TV Damper 5Y Maintenance Service

However “small service” should be carried out 20 ~24,000hr, it is very difficult to do so for ship’s crew even open-up fore shield cover. Therefore every 5Y(Dry-dock), we recommend to carry out bellow works by HSD Engine or authorized engineer

*Also can be done as combination with ME maintenance during dry-dock.

WORK TO BE PERFORMED

SMALL
ALL
20 ~ 24,000 HR

LARGE
ALL
40 ~ 48,000 HR

Visual check of the bearing running surfaces for grinding(fretting), corrosion, oxidation, discolorations as a result of increasing bearing temperature, etc.

X

Check permissible wear. Repair worn parts or replace them, if necessary

X

Check wear of bearings ( 15 ).

X

Check wear of middle blades ( 1 ).

X

The "large Service Should be done by Geisliner SE or authorized service station

Check wear of inner star ( 9 ).

X

Replace the O-rings ( 851 )

X

Replace all removed bolts, screws and nuts with thread size up to and including M20

X

Check all removed bolts, screws and nuts with thread size larger than M20

X

Day 1 : Preparation

Dismantle accessories and open-up fore shield cover

Day 2 ~ 3 : Inspection

Inspection by GEISLINGER engineer

Day 4 : Assemble

Overhaul Service

Replacement & Overhaul

Inspection Service

Inspection & Function Test

Based Recommendation Items

Category of kits

Description

Interval - 5Y

Service kit for alpha lubricator

Membrane Accumulator (Big)

Replace

Service kit for alpha lubricator

Membrane Accumulator (Small)

Replace

Service kit for alpha lubricator

Solenoid valve on lubricator

Replace

Service kit for alpha lubricator

Inductive sensor in lubricator

Replace

Service kit for alpha lubricator

Lubricator check valve (5bar)

Replace

Maintenance kit for alpha lubricator

Lubricator OBHL. O-ring set

Replace

Lubricator pump station service kit

Spiders of pump for booster pump

Replace

Lubricator pump station service kit

Seal of pump for booster pump

Replace

Lubricator pump station service kit

Sution filter element

Replace

Lubricator pump station service kit

Pressure filter element

Replace

Pick-up for BCU (Back-up Control Unit)

Pick-up sensor for Flywheel side

Replace

The pneumatic control system is to be in reliable condition for safe berthing and leaving. That’s why we, HSD Engine, recommend periodical maintenance at every 5Y

Supply & Work Scope

Man Power

Option 1.

2 Days

Effect & Benefit

Option 2.

4 Days

Sea-Trial (If necessary)

1 Days